Feed updated: 8:24 PM EST.
Bridgewater: MBTA Commuter Rail departures and arrivals today
Next MBTA Commuter Rail train from Bridgewater: train 8125 to Fall River Depot, scheduled 8:30 PM EST. 2 trains are listed in the loaded timetable, the last one scheduled 10:27 PM EST.
Today at Bridgewater: first MBTA Commuter Rail train leaves at 12:42 AM EST (train 8525 to New Bedford), first after 4:00 AM at 4:59 AM EST (train 8002 to South Station), last at 11:26 PM EST (train 8129 to Fall River Depot). Scheduled times.
Upcoming trains
- Train 8125 · Fall River Depot
Scheduled 8:30 PM EST · Predicted 8:32 PM EST
- Train 8032 · South Station
Scheduled 10:27 PM EST · Live unavailable
Questions about MBTA Commuter Rail trains at Bridgewater
When is the next MBTA Commuter Rail train from Bridgewater?
Train 8125 to Fall River Depot is scheduled at 8:30 PM EST. Live predictions, when the feed has them, appear in the list above.
Where do trains from Bridgewater go?
In the loaded timetable the most frequent destinations are Fall River Depot (1), South Station (1).
How many trains are listed?
2 upcoming calls at Bridgewater. The board holds trains in service now and the timetable loaded for today, so a later train may not be listed yet.